PCR Workstations and Cabinets Installation and User Instructions UVP, LLC Ultra-Violet Products Ltd. 2066 W 11th Street, Upland, CA 91786
PCR Workstations and Cabinets Page 10 Door Assembly 1. Remove the protective film from the Makrolon® panels. 2. Slide the upper panel of the D
PCR Workstations and Cabinets Page 11 Operating the PCR Hood The PCR Hoods feature: • Three-stage HEPA filtration system with pre filter, c
PCR Workstations and Cabinets Page 12 HEPA/UV3 Control Panel: UV1 and UV2 Control Panel: To use the UV decont
PCR Workstations and Cabinets Page 13 Decontaminated UV airflow into and out of the chamber The Makrolon® door is UV blocking and will not allow
PCR Workstations and Cabinets Page 14 Care and Cleaning The PCR Hoods are built to provide trouble-free operation. NOTE: The door and side pan
PCR Workstations and Cabinets Page 15 Maintenance and Replacement Parts/Accessories Replacement Parts and Accessories Replacement parts are lis
PCR Workstations and Cabinets Page 16 Replacing the Fuses Fuses are located on lower corner of the system. To remove the fuse, use a flathead
PCR Workstations and Cabinets Page 17 4. Carbon Filter: Slide the filter assembly out of the chamber. The Carbon Filter (76-0352-01) then slides
PCR Workstations and Cabinets Page 18 Measuring the UV Tube Intensity As the ultraviolet tubes age, the intensity and germicidal destruction rate
PCR Workstations and Cabinets Page 19 Technical Assistance Note: A Returned Goods Authorization (RGA) number must be obtained from UVP Customer
PCR Workstations and Cabinets Page 2 Introduction The UV1 and UV2 PCR Hoods create an ideal environment for preparing PCR and other samples by re
PCR Workstations and Cabinets Page 3 HEPA/UV3 PCR MODELS HEPA UV3 PCR Cabinet HEPA UV3 PCR Workstation 95-0434-01 115V 95-0434-02 230V UK 95-0434
PCR Workstations and Cabinets Page 4 Operational Ratings • PCR Hoods are intended to be used indoors only • Altitude must not exceed 2,000m • A
PCR Workstations and Cabinets Page 5 Assembling the PCR System Carefully remove the PCR Hood components from the packaging. CAUTION: Use ca
PCR Workstations and Cabinets Page 6 NOTE: It is advised to use the remaining bubble wrap to protect the antibacterial-coated surfaces during asse
PCR Workstations and Cabinets Page 7 Inner Back Panel 1. Position the Inner Back Panel so that the screw holes align with the Outer Back Panel.
PCR Workstations and Cabinets Page 8 5. Tighten all Frame screws to secure the Makrolon® Panels in place. Top Assembly and Shelf Assembly 1.
PCR Workstations and Cabinets Page 9 5. Tuck all of the connected wires between the Inner and Outer Back Panels. 6. Slide the Top Assembly down
Comments to this Manuals